top of page
Portfolio
A Selection of Our Latest Jobs

01
Offshore Rope Acess

02
Bathroom Light Replacement

03
Post Lights Installed with Concreted Bases

04
Cable Installation in a New Building

05
Testing the Gear Set Up Before a Job

06
Carrying Out a Hazardous Area Inspection and Remedial Works

07
Connecting up an Exd Mud Treatment Motor

08
Consumer Unit Fitted with 2 Double Sockets

09
Fitting a WiFi Integrated Switch for Flood Lights

10
Light Fitting Replacement

11
Offshore Rope Access

12
Fixing a Loose Connection on Neutral Terminal Which Caused Intermittent Tripping of RCD

13
Replaced and Fitted a New Consumer Unit

14
Replacing a Light Fitting

15
Replacing an Outdoor Light

16
Rope Access Cleaning

17
Insulation Resistance Testing on an Overhauled Exd Motor

18
Gas Pipe Electrical Bonding
01 / 18
Offshore Rope Acess

01
Offshore Rope Acess

02
Bathroom Light Replacement

03
Post Lights Installed with Concreted Bases

04
Cable Installation in a New Building

05
Testing the Gear Set Up Before a Job

06
Carrying Out a Hazardous Area Inspection and Remedial Works

07
Connecting up an Exd Mud Treatment Motor

08
Consumer Unit Fitted with 2 Double Sockets

09
Fitting a WiFi Integrated Switch for Flood Lights

10
Light Fitting Replacement

11
Offshore Rope Access

12
Fixing a Loose Connection on Neutral Terminal Which Caused Intermittent Tripping of RCD

13
Replaced and Fitted a New Consumer Unit

14
Replacing a Light Fitting

15
Replacing an Outdoor Light

16
Rope Access Cleaning

17
Insulation Resistance Testing on an Overhauled Exd Motor

18
Gas Pipe Electrical Bonding
bottom of page